Fenelon Falls Community Centre construction update

March 29, 2012

OWNER: City of Kawartha Lakes

DATE: Mar 27, 2012

PROJECT: Community Center and Arena    

LOCATION: Fenelon Falls

Sprinkler piping is 95% complete

Mechanical duct work installation is 90 % complete.

All exterior siding is complete

Rough in plumbing is complete in wash rooms and showers in change rooms.

Main Electric panel switch-gear and breakers have been completed.

The building transformer has been installed by Hydro One.

The main switch panel has been energized.

50% of the outer rink slab has been poured

Ice making equipment installation is well underway.

Desuperheater and infrared ice controller have been ordered.

Painting has commenced in the community center area.

All service connections are complete.

Air handling units have been set in place.

Ceramic Tiling has been completed in change room and  washrooms.

Fire protective coatings have been applied to selected structural steel as required.

Elevator installation will commence in three weeks.

Recent construction pictures