April 15, 2011 - Work continued this week on the major renovation project at the Lindsay Recreation Complex.
Note : As of Monday April 18th Front Entry Closes for Renovation
See signage on site for alternate entrances.
Physical changes to the facility since the last communiqué include:
Concessions
Millwork installation ongoing
Final painting
Cove base and Ceiling tile installed
Mechanical and electrical finishes completed
Corridor 142 (main floor elevator)
Drywall ceilings and bulkheads completed
Millwork installed
Elevator Lobby on 2nd Floor
Drywall taping completed
Painting new walls and bulkheads
Install display case, flooring, base and ceiling
Mechanical and electrical finishes
Elevator
Install dedicated phone line
Complete all outstanding items for final inspection
Lobby
Continue work on bulkheads
Pool Area
Aluminum doors installed
Fitness Addition
Drywall touch ups and taping on both floors and in Stairwell to be completed
T-Bar ceilings and millwork installed
Painting 80 % finished
Commence, Mechanical and electrical finishes
Administration Addition
Louvers re-ducted
Low roof drain, Roofing on low roof section
Install exterior doors and frame
Completed window frames and glazing to Lobby
Install masonry veneer
Underground plumbing rough-in to start
Family B/F Change Room / Shower / Washroom
Tile and flooring, millwork, painting, plumbing and lighting completed
Toilet partitions, accessories and ceiling tiles installed
Deficiency inspection and repairs
Plans for the upcoming two weeks include:
Washrooms
Damaged toilet partitions panels replaced
Final clean up and turn over
Concessions
Millwork installation completed
Final painting
Ceiling tile installed
Mechanical and electrical finishes completed
Final clean up and turnover
Corridor 142
Drywall ceilings and bulkheads sanded out
Millwork installed
Final painting, Final clean up and turnover
Elevator Lobby on 2nd Floor
Display case completed
Drywall taping completed and sanded out
Painting of drywall walls and ceilings
Install T-bar ceilings
Flooring and base installed
Mechanical and electrical finishes
Final clean up and turn over
Elevator
Final inspection clean up and turn over
Lobby 102
Drywall bulkheads from Elevator to Aquatics Door ongoing
Pool Area
Complete floor tile at east window
Install balance of exterior siding
Paint balance of block and drywall bulkheads
Fitness Addition including Corridor 118 and Lobby 112
Corridor and Lobby Drywall and Painting finished
Flooring installed
Mechanical and electrical finishes ongoing
Final clean up and turned over April 25
Administration Addition
Roofing completed
Rough-in Washroom plumbing
Pour concrete floors
Install firewall
Ductwork installation ongoing
Masonry veneer ongoing
Entrance Addition
Temporary entrance to be set up by April 15th
Excavation to commence Monday, April 18th
Current Service Interruptions:
Hoarding at rear of Community Room and in main lobby
Relocation of all land based Fitness classes to the Victoria Park Armoury
Relocation of ramp to main entry
Elevator Access to Community Room unavailable
Closure of controlled-entry door to pool lobby
Detour in place for access to the Community Room.
Note : As of Monday April 18th Front Entry Closes for Renovation
See signage on site for alternate entrances.
Throughout construction regular updates will be available for our patrons and the public via our website (www.city.kawathalakes.on.ca/renovations) and with information available within the facility. We ask your cooperation and understanding as our spaces are re-worked.
-30-