April 15, 2011 - Work continued this week on the major renovation project at the Lindsay Recreation Complex.

Note : As of Monday April 18th Front Entry Closes for Renovation

See signage on site for alternate entrances.

Physical changes to the facility since the last communiqué include:

Concessions

Millwork installation ongoing
Final painting
Cove base and Ceiling tile installed
Mechanical and electrical finishes completed

Corridor 142 (main floor elevator)

Drywall ceilings and bulkheads completed
Millwork installed

Elevator Lobby on 2nd Floor

Drywall taping completed
Painting new walls and bulkheads
Install display case, flooring, base and ceiling
Mechanical and electrical finishes

Elevator

Install dedicated phone line
Complete all outstanding items for final inspection

Lobby

Continue work on bulkheads

Pool Area

Aluminum doors installed

Fitness Addition

Drywall touch ups and taping on both floors and in Stairwell to be completed
T-Bar ceilings and millwork installed
Painting 80 % finished
Commence, Mechanical and electrical finishes

Administration Addition

Louvers re-ducted
Low roof drain, Roofing on low roof section
Install exterior doors and frame
Completed window frames and glazing to Lobby
Install masonry veneer
Underground plumbing rough-in to start

Family B/F Change Room / Shower / Washroom

Tile and flooring, millwork, painting, plumbing and lighting completed
Toilet partitions, accessories and ceiling tiles installed
Deficiency inspection and repairs

Plans for the upcoming two weeks include:

Washrooms

Damaged toilet partitions panels replaced
Final clean up and turn over

Concessions

Millwork installation completed
Final painting
Ceiling tile installed
Mechanical and electrical finishes completed
Final clean up and turnover

Corridor 142

Drywall ceilings and bulkheads sanded out
Millwork installed
Final painting, Final clean up and turnover

Elevator Lobby on 2nd Floor

Display case completed
Drywall taping completed and sanded out
Painting of drywall walls and ceilings
Install T-bar ceilings
Flooring and base installed
Mechanical and electrical finishes
Final clean up and turn over

Elevator

Final inspection clean up and turn over

Lobby 102

Drywall bulkheads from Elevator to Aquatics Door ongoing

Pool Area

Complete floor tile at east window
Install balance of exterior siding
Paint balance of block and drywall bulkheads

Fitness Addition including Corridor 118 and Lobby 112

Corridor and Lobby Drywall and Painting finished
Flooring installed
Mechanical and electrical finishes ongoing
Final clean up and turned over April 25

Administration Addition

Roofing completed
Rough-in Washroom plumbing
Pour concrete floors
Install firewall
Ductwork installation ongoing
Masonry veneer ongoing

Entrance Addition

Temporary entrance to be set up by April 15th
Excavation to commence Monday, April 18th

Current Service Interruptions:

Hoarding at rear of Community Room and in main lobby
Relocation of all land based Fitness classes to the Victoria Park Armoury
Relocation of ramp to main entry
Elevator Access to Community Room unavailable
Closure of controlled-entry door to pool lobby
Detour in place for access to the Community Room.

Note : As of Monday April 18th Front Entry Closes for Renovation

See signage on site for alternate entrances.

Throughout construction regular updates will be available for our patrons and the public via our website (www.city.kawathalakes.on.ca/renovations)  and with information available within the facility. We ask your cooperation and understanding as our spaces are re-worked.

-30-

Media Inquiries:

Communications Officer

705-324-9411 ext. 1355

bstonehouse@city.kawarthalakes.on.ca

Document Actions

Race_for_Kids.jpg

rural_transit_banner3.jpg

lindsay_transit_logo_portlet.jpg

CITP_Logo_2012.jpg