Personal tools
You are here: Home / Property, Development & By-Law / Engineering and Assets / Bolton Street Re-construction

Bolton Street Re-construction

Filed under:

A Public Information Center (PIC) was held on Thursday November 25, 2010 (4:00 pm to 8:00pm) at the Bobcaygeon Service Center, to consider the proposed reconstruction of Bolton St. between King St. and Canal St. within the Village of Bobcaygeon.

Map of Bolston Street reconstruction zone in Bobcaygeon

The purpose of the Public Information Center was to update the public about the City of Kawartha Lakes’ proposed reconstruction of Bolton St.  The public was given the opportunity to provide comments and feedback to the municipality regarding the proposed work

The project will include full road and watermain reconstruction including adjustments to the profile to improve drainage within the project limits as well as a new streetscape design.

Material Presented at the Public Information Center:

Clarification: Proposed light standards are acorn style with LED bulb.

Presentation:

Bolton Street Reconstruction Presentation (PDF)

Display Material:

Bolton Streetscape Plan Part 1 (PDF)

Bolton Streetscape Plan Part 2 (PDF)

Road Cross Section No 1 (PDF)

Road Cross Section No 2 (PDF)

Proposed Garbage Receptacle (PDF)

Proposed Bench (PDF)

Proposed Street Light Standard (PDF)

Related Material:

Streetlight calculations (PDF)

Feedback / Comment Sheet (PDF) (Word)

Please note that feedback / comment are requested by Dec 10, 2010

Contact Information:

Corby Purdy, C.E.T.
Senior Engineering Technician
705 324 9411 ext. 1155
Email: cpurdy@city.kawarthalakes.on.ca

Document Actions

Share |