Engineering
Growth Management Study & Master Plan
The presentation from Public Information Centre #2 can be accessed via the Urban & Environmental Management Inc. website. Simply followthe link and the presentation is the fourth file on the list, titled "Presentation Public Information Centre No. 2."
Fenelon Falls Drainage Study Basin (DD)
- Fenelon Falls Drainage Study (Basin DD) and Traffic Impact Study - 11 Mb
- Fenelon Falls Drainage Study Basin Presentation (PDF) - 6 Mb
- Public Handout (PDF)
- Comment Form (PDF)
Aggregate Haul Route Study and Policy
- Notice of Public Information Sessions Concerning the Aggregate Haul Route Study for the City of Kawartha Lakes (PDF) (Word)
- Aggregate Haul Route Study - Final Report - PDF (2.6MB)
- Figure 2 - Transporation Network - PDF (2.1MB)
- Figure 3 - Highway Classification - PDF (2.1MB)
- Figure 4 - RD Network Deficiencies - PDF (1.7MB)
- Figure 5 - Existing Pits and Quarries - PDF (3.0MB)
- Figure 6 - Social-Natural Environment - PDF (3.0MB)
- Figure 7 - Recommended Haul Route - PDF (3.8MB)
Area-Specific Development Charge Background Study – Southeast Development Area
- City of Kawartha Lakes Area-Specific Development Charge Background Study – Southeast Development Area
- City of Kawartha Lakes Area-Specific Development Charge Background Study – Northwest Development Area (contact the Clerks Office to obtain this study in hard copy or on CD)
The Engineering Department is located at 12 Peel Street in Lindsay and develops and plans for the future public works infrastructure and capital works within the municipality.
To contact the Engineering Department:
Mail
City of Kawartha Lakes Engineering Department
P. O. Box 9000
Lindsay, ON K9V 5R8
Phone
705-324-9411 Ext. 1146
Fax
705-324-2982
Email
dkehoe@city.kawarthalakes.on.ca




