We are pleased to announce the barrier free/family change room and the new two storey Fitness Centre are now open!

Construction to the main entrance is ongoing and detours are in place.

Physical changes to the facility since the last communiqué include:

Washrooms

Turnover

Concessions

Millwork complete

Awaiting counters

Corridor 142 (main floor elevator)

Drywall ceilings and bulkheads completed

Millwork installed

Elevator Lobby on 2nd Floor

Drywall taping, sanding and painting completed

Install display case, flooring, base and ceiling

Mechanical and electrical finishes

Elevator

Awaiting final inspection

Lobby

Continue work on bulkheads

Demolition of washrooms and interior walls

Pool Area

Aluminum doors installed

Complete tile under windows

Complete exterior siding

Fitness Addition

Drywall ongoing in Fitness Studio

Administration Addition

Mechanical and electrical rough in ongoing

Studs and drywall complete

Family B/F Change Room / Shower / Washroom

Complete

Entrance Addition

Footings and foundation complete

Backfill complete

Plans for the upcoming two weeks include:

Washrooms

Final clean up and turn over

Concessions

Counter, plumbing fixture and trims

Corridor 142

Electrical fixtures and turnover

Elevator Lobby on 2nd Floor

Final clean up and turn over

Elevator

Final inspection clean up and turn over

Lobby 102

Drywall bulkheads from Elevator to Aquatics Door ongoing

Mechanical and electrical rough in

Sprinkler installation ongoing

Pool Area

Paint balance of block and drywall bulkheads

Fitness Addition including Corridor 118 and Lobby 112

Stair 6 remains closed – detour in place

Administration Addition

Mechanical /electrical ongoing

Entrance Addition

Exterior steel to commence

Current Service Interruptions:

Main entry closed to the public – detours in place

Main lobby and Community Room closed to the public until main entry re-opens.

Relocation of main office to  Pool lobby

Relocation of all land based Fitness classes to the Victoria Park Armoury

Throughout construction regular updates will be available for our patrons and the public via our website (www.city.kawathalakes.on.caa/renovations)  and with information available within the facility. We ask your cooperation and understanding as our spaces are re-worked.

Document Actions

Family Doctors Wanted for the City of Kawartha Lakes. Discover Real Family Medicine. Kawartha Lakes Health Care Initiative.

Safe Communities

Lindsay Transit - Ride Smart

KLRW_Logo.jpg

Pay Taxes and Water Bills Online

epost.jpg

Community Care